Statement Corrugated Glass Entrance

“This project was truly unique: to the best of our knowledge there is no other building in the UK that features a similar corrugated  glass installation. Unique and very individual projects such as this are a key element of Ion Glass’ remit, securing our reputation for high quality, fully functional, fully compliant and wholly bespoke installations.”

A substantial commercial building in Reading wanted a truly impressive and statement entrance. The design was for two 7m high screens of corrugated glass panels on either side of the doors, with mirrors set behind for a unique, reflective finish.

Overview

The client had investigated various options for a statement entrance and came across the concept of corrugated glass fitted internally at a building in the States. They approached Ion Glass to establish if something similar could be created in the UK for an external installation.

This is a wholly bespoke product and Ion worked closely with the glass manufacturer initially to establish if it was possible to create panels of this size and integrity with a consistent corrugated finish and thereafter to fine tune the design to meet the brief.

At 7m high, the screen had to be created in ten separate panels and the corrugations had to work flawlessly both vertically and horizontally where the panels joined.

The installation consists of two corrugated screens on either side of the entrance door and is 7m high and almost 2m wide.  It was manufactured in ten separate panels and set into bespoke stainless-steel channel, created to accommodate the corrugated glass.

Each corrugated glass panel was individually manufactured in 13.5mm clear laminated safety glass with perfectly regular corrugations designed to flow across the width of the installation and to be continuous vertically through all five panels.

Behind the screens is a series of mirrored panels consisting of 6mm thick safety backed low iron mirror bonded to 12mm marine plywood and fitted to the metal structure.

With a very clear vision as to the desired aesthetic the design and planning phase for this project was complex. Ion had to achieve a consistent and flawless result with the ground-breaking manufacturing process of the glass itself and also establish the methodology to fix and install the combination of mirrored and corrugated glass to meet the structural requirements.

The final installation added another challenge for the Ion teams as it was not possible to use a mobile crane with suckers to assist in lifting the glass.  Each panel had to be lifted and manoeuvred into position by hand, a testament to the skills and experience of our on-site technicians.