Glazed Link, St John the Evangelist Church, Manthorpe

“This innovative project was awarded ‘Development Project of the Year’ in the Greater Lincolnshire Construction and Property Awards 2023.  The new building not only looks impressive but fully meets the needs of the local parish, helping to re-generate community life in Manthorpe and the surrounding area.”

Grade II listed, the church of St John the Evangelist was dedicated in 1847 to serve the little village of Manthorpe in Lincolnshire. It recently benefitted from the addition of a community hall connected to the original building with a bespoke glass link

Overview

The Church of St John the Evangelist was the beneficiary of a generous legacy from Ina Hawley, a local resident and former headmistress of the local school who had lived all her life in the village and bequeathed over a million pounds to the church on her demise.

The legacy funded the building of a Community Hall to allow for a much wider range of church and community activities.  Since it opened in 2021, the Community Hall has become a vibrant space at the heart of village life, welcoming a diverse range of groups from yoga sessions to gardeners and bobbin lace enthusiasts as well as providing a space for gathering after services.  The new building connects directly to the church and has full disabled access with a modern kitchen space and unisex toilets.

A full height glass link, extending over the slope of the roof connects the original listed church building to the new hall, providing a visual and physical interface between new and old.  Use of a glass link in these circumstances is often the only option recognised by Historic England as it allows for changes in movement between the two buildings, overcoming any issues related to the difference in building techniques.

The innovative addition of the double-glazed glass roof ridge allows light to flood into the new space from above and also provides an uplifting view of the church spire for people using the hall.

Glass doors were installed throughout the project: Ion supplied a series of internal glass doors, two of which were fitted with secure locks for additional security.

Product

A bespoke double-glazed glass link to the new extension comprising of vertical and sloped glazing, interfacing with a double-glazed glass ridge which extends along the length of the new community hall.  Three frameless glass doors installed with either one or two fixed side panels, two doors fitted with secure locks.

The glass ridge comprises of three fully bespoke sealed double-glazed units with a 6mm clear toughened outer pane and 13.5mm laminated toughened inner pane with low e-coating.  All units were fully heat soak tested to minimize any future potential for glass failure caused by nickel sulphide inclusion (heat soak testing reduces the risk to less than 5%).   A custom-built stainless steel perimeter frame was designed and manufactured by Ion Glass to accommodate the glass panels, with joints filled and finished with structural silicone sealant.

Ion’s technicians ensured that the roof ridge met all structural requirements, including snow loading as necessary and the design provided a slight angle to allow for adequate run-off of rainwater.

The vertical and sloping glass links comprised of silicone sealed structural double glazed units with 10mm clear heat soak tested outer panes and 13.5mm laminated toughened low E coated inner panes.  Each panel was commissioned and made to precision specifications, ensuring the glass fitted perfectly around the carved stonework of the building.   Ion’s standard practice utilises digital measuring techniques to ensure accurate measurements around every surface including carved stonework, brickwork, wood, uneven floors and out of true walls.

Three individually designed and manufactured frameless glass internal doors were all single pivot, mounted top and bottom and fitted with hydraulic spring closers.  Two of the glass doors had single fixed glass side panels, the third door had a single fixed glass panel on either side: the panels were all installed using brushed stainless steel effect glazing channels with 10mm glass fitted throughout.  A simple glass manifestation in the form of a double row of dots was applied to the glass doors and side panels, to meet current regulations.

Installation logistics were fully managed by Ion Glass, including the deployment of a mini-spider crane to manoeuvre the glass units into place.  The height of the project was an additional challenge but Ion’s experienced installation team are used to working in many different environments.